No Image

‘Henri Dutilleux’ Conservatoire / Dominique Coulon & associés

November 3, 2019 Daniel Sánchez 0

The building is located in the upper part of the town. It backs onto the woods, forming the final outlying limit of the built-up area. Echoing the open landscape, it faces to Belfort Lion on the hilltop opposite. In this strong context, the building offers its solidity, an almost opaque mass of grey concrete. The surface of the mass has an unusual texture, hinting at plants or the veins in marble. It has been achieved by drip painting in two shades of blue. The drips of paint lend depth and thickness to the skin of the building. The surfaces vibrate in the light, apparently in motion – matter ceases to be static.

No Image

Product Of The Week: The New Generation Meural Digital Canvas

November 3, 2019 HD Staff 0

Digital art frames are beginning to carve a little niche for themselves. Meural has recently started taking orders for their Canvas 2 which is their second iteration of the product after getting acquired by Netgear in 2018. Get it on Amazon. Recommended Reading:  Exquisite Floral X-Ray Art Prints By Albert Koetsier

No Image

Chybik + Kristof builds Prague food market in shiny metal cabins

November 3, 2019 Jon Astbury 0
Manifesto Market in Prague by Chybik + Kristof

A temporary cluster of corrugated metal-covered units surround a shallow pool at Manifesto Market in Prague’s historic Smichov district, designed by architects Chybik + Kristof. Located in a former parking lot sandwiched between the 20th-century National House of Smichov and a former market hall, the food market is intended to reinvigorate a neglected area of

The post Chybik + Kristof builds Prague food market in shiny metal cabins appeared first on Dezeen.

No Image

Production Plant 4.0 / Neugebauer + Roesch Architekten

November 3, 2019 Pilar Caballero 0

The new build is conveniently located close to the A4 to the west of Dresden. A manufacturing hall measuring 143 by 62 metres, where the dialysers are assembled under cleanroom conditions, is the main part of the project. Offices, areas for recreation and logistics, as well as a boiler house to the rear of the plot, complement the industrial estate. The plant with a gross floor area of 15,000 m² provides workspace for a total of 140 persons. The design submitted by Neugebauer + Roesch won the architecture design competition initiated by B. Braun. Among other things, the judges commended the “appropriate blend of representative appearance and functionality” in the planning practice’s proposal.