No Image

Reconstruction and Extension Inselhalle Lindau / Auer Weber

October 10, 2018 Martita Vial 0

The renowned Nobel Laureate Meetings are the most distinguished among the various conferences that enjoy the flair of the island town of Lindau. Over the years, however, the conference venue was no longer meeting modern demands. Thus, an architectural competition for the reconstruction and extension of the conference center was launched.

No Image

Paul Street / Stiff + Trevillion

October 9, 2018 Daniel Tapia 0

Mixed-use development scheme that incorporates Grade II Listed walls delivers a new 4,0282m building of office, retail and residential over five stories in the heart of a Shoreditch conservation area. Stiff + Trevillion has completed a 4,0282m mixed-use development on the historic junction of Paul Street and Leonard Street that integrates a remnant of the neighboring Grade II Listed ecclesiastical building abutting the adjacent park, and takes full advantage of its prominent corner location.

No Image

Jenkins Street / C.Kairouz Architects

October 8, 2018 Pilar Caballero 0

Jenkins Street is a juxtaposition in many ways. It flawlessly mixes private & intimate spaces with open plan living and the architecture provides contrast with new modern-contemporary meeting with old period-art deco. The dynamic of new and old, and diversity on a functional level as well as a visual level alludes to a home with a perceived split personality; made tranquil with the right balance of yin and yang.

No Image

House in Guimarães / Correia/Ragazzi Arquitectos

October 8, 2018 Daniel Tapia 0

The program consisted of the rehabilitation of an existent construction which, given its state of degradation, functioned only as support for the agricultural activity, however, it was necessary to consider an area for housing. The existent construction consisted of an area of traditional stone masonry walls and a late addition of poor characteristics and state of conservation in plastered brick walls. We’ve opted to demolish the latter in order to highlight the original features of the stone volume. In the farm existed also other traditional constructions of great interest such as a granary, a mill, a tank, and a stone threshing floor.

No Image

De Beauvoir Block / Henley Halebrown

October 8, 2018 Pilar Caballero 0

This Spring saw the completion of De Beauvoir Block – a group of 33 workspaces over three floors ranging from 250 square feet to 3,000 feet designed and equipped to support individuals and businesses, particularly those involved in the creative industries.  Known as ‘The Block’, the building is located in the nineteenth century neighbourhood of De Beauvoir Town, Hackney (East London), which was largely open country until the 1820s when a new, predominantly residential area was built.

No Image

Scheune Minden / Architekten Stein Hemmes Wirtz

October 8, 2018 Daniel Tapia 0

The building on the edge of the forest of Minden an der Sauer stood empty for many years. Externally exposed to decay, its former use was still readable inside: a stable with a feeder on the ground floor and the large hay storage with signs of installation of a micro-apartment on the upper floor.

No Image

Stair-Case Malasaña / Mariana de Delás + Marcos Duffo

October 7, 2018 Daniel Tapia 0

Stair-Case Malasaña is the result of an exploration on how to grow up in altitude using the minimum plan space whilst using the staircase as the generator for complementary activities. The client owned a 46sq meter apartment with a small ladder up to the attic which was unventilated and humid and only used for insulation and storage. The proposal was to enhance this area by opening it to the main room and use it as an extra bedroom for guests.

No Image

Canteen and Locker Room of Sarmad Iron and Steel Co. / Makanpaydar Consulting Company

October 7, 2018 Daniel Tapia 0

Canteen, locker and shower buildings of Sarmad (Abarkooh) Iron and Steel Industries Company, with a total built area of 1,650m2, is located in Abarkooh, in a distance of 150km from Yazd. In the master plan of the company site, these two buildings were located next to the office building, which was designed and built earlier, to make the service complex. Therefore the new buildings were designed based on the existing office building in order to maintain the harmony of colors, forms, and materials in the complex.